Programming and commissioning
Programming to your specifications and standards, e.g. the VW standard. If none exist yet, we develop suitable standards together. Support right up to start of production.
Robot programming · Commissioning · Project management
Programming, commissioning and optimisation of industrial robots, from a single cell to a complete production line. Working worldwide since 2012, with a focus on the automotive industry.
An optimal line is the result of precise planning and careful execution. I support you from virtual commissioning all the way to stable series production.
Programming to your specifications and standards, e.g. the VW standard. If none exist yet, we develop suitable standards together. Support right up to start of production.
Programs are tested in simulation before the line is built. This shortens on-site commissioning and reduces downtime.
In almost every robot cell, cycle time can be reduced by 10 % or more without compromising quality or process reliability, for example through optimised paths and interlock zones.
Finding faults and weak spots in programs, isolating the root cause and fixing it for good, together with your maintenance team.
For five years I have been leading complete robotics projects: planning, schedules and teams of up to 20 programmers, from virtual commissioning to start of production.
Support for your maintenance and production teams with experienced line operators, plus training for your staff to keep availability and output on target.
Most enquiries don’t come in quiet phases, but when deadlines are tight or a line isn’t running the way it should.
Real project experience with four robot manufacturers, from commissioning and optimisation to large-scale projects.
Programming, commissioning, process optimisation and troubleshooting. Coordination of lines with up to 300 iB and iB+ generation robots. Welding, gluing and handling to the VW standard.
KRC4 handling and welding robots, cycle time optimisation, camera systems and laser cutting. Team lead for the integration of around 200 KUKA robots.
Complete production lines from commissioning to start of production, gluing applications, wax preservation and virtual commissioning.
Handling programs, laser cutting and systems with an external travel axis serving multiple stations.
From projects in body-in-white, the supplier industry and special-purpose machinery.
An overview of more than ten years of robot programming in Europe, Asia and the Americas, from a single cell to lines with several hundred robots.
Coordination of new body-in-white lines with around 300 FANUC robots, including coordination of virtual commissioning.
Coordination of a new line with around 150 FANUC robots.
Led the virtual commissioning of two production lines with ABB and FANUC robots, followed by on-site commissioning through to start of production. Team of 20 programmers.
Several years as team lead for the integration of around 200 KUKA robots for doors and side panels.
Several virtual commissioning projects for lines with ABB, KUKA and FANUC robots.
Two lines with around 50 ABB robots, responsible from commissioning to start of production.
Commissioning to start of production with FANUC, ABB and KUKA robots.
Conveyor systems with four to six handling robots, synchronous picking from the conveyor, cycle time optimisation and troubleshooting.
Programs and interlocks to the VW standard, cycle time optimisation on welding and handling robots.
Laser cutting, camera systems for part detection and battery production.
I’ll gladly send you a detailed project list with references on request.
Request project listSince 2021, Selbst Automatisierung has been providing robot programming and automation solutions: young, flexible and reliable. My main focus is the automotive industry, but I also support projects in many other sectors.
I work with robots from FANUC, KUKA, ABB and Yaskawa Motoman. My deepest expertise is with FANUC: programming, commissioning, process optimisation and troubleshooting. For the past five years I have worked continuously in project management, leading complete robotics projects with teams of up to 20 programmers and lines with several hundred robots.
My standard: 100 % quality, short production times and a project you can rely on. I work in German, English and Spanish.
Clear agreements, short lines of communication and a line that runs at the end.
You describe the line, controller and timeframe.
We agree on scope, schedule and contacts.
Programming, commissioning or optimisation directly at the line.
Acceptance, documentation and support until stable series production.
Planning a commissioning, looking to cut cycle time or need support at your line at short notice? The fastest way is a phone call or a short email.
This information helps me assess your enquiry quickly: